PLEASE READ FREQUENTLY ASKED QUESTION MENTIONED IN THE HOME PAGE.
BENEFITS:
- Applicable for the Pradhan Mantri Surya Ghar Yojana subsidy of Rs. 78,000.
- Benefit from the production of 405 units monthly or 810 units bi-monthly (4,900 units annually).
- Total yearly savings ranging from Rs. 35,550 to Rs. 56,595.
- This system is the best solution for all homeowners.
A complete 3.3 kilowatt on-grid system, which includes:
- Bifacial DCR panels (DCR – eligible for subsidy).
- Polycab inverters single phase and cables. (single phase inverters can also be used for 3 phase connections as long as the load is below 3.6 kw above which 3 phase inverters are preferred)
- DC-AC earthing and lightning arresters.
- AC and DC Distribution Box
- Structure for Panels
Note: Application filing for net metering and the subsidy claim process are included.
- You can apply for net metering and the subsidy yourself via the online portal.
- If you prefer, Raksha Solar can handle the net metering application process and subsidy claim process on your behalf.
WHO CAN BENEFIT FROM THIS SYSTEM?
- Anyone with a domestic electrical connection.
- Homeowners with roof top space
- Apartment owners (if installation is allowed).
- Anyone with an electricity bill of Rs.3000 a month of more than 450 units monthly can maximize the benefits of this system.
WHY ARE THERE DIFFERENT TYPES OF STRUCTURES?
- An elevated 8ft tall structure doesn’t occupy your roof space
- A roof mount 4ft structure will occupy your roof space
- If you already have a sheet metal or an inclined structure where the panels can sit flush against the roof then there is no requirement for an elevated structure.
- If any custom structural work is required then you can contact us for site inspection
- In 99% of cases these 3 type of structures satisfy the users requirements
HOW DO I GET STARTED ?
- Just place the order and contact details and we will get started
- It takes just 2 days for project completion.
- less than 30 days for the installation of net-meter by the TNEB
- Less than 30 days for the subsidy to arrive